PEMELIHARAAN ASSET TAHUN 2014

NO

TANGGAL / NO. SURAT

YANG MENGUSULKAN

JENIS PEMELIHARAAN

KETERANGAN

1

127/UN10.6.5/TU/2014

27 FEBRUARI 2014

KAJUR ARSITEKTUR

PENAMBAHAN 8 PORT HP 1 BUAH DI RUANG BACA JURUSAN

SELESAI (6 MARET 2014)

2

28 FEBRUARI 2014

 

KABEL TELPON HIDROLIKA-MUSHOLA PUTUS

SELESAI

3

5 MARET 2014

PWK

   TELPON NO 1147 JURUSAN PWK ADA NADA PANGGIL TIDAK ADA SUARA

   UNTUK TELPON TIDAK BISA MULAI AKHIR FEBRUARI

SELESAI

4

21 APRIL 2014

PWK

TANDON AIR PWK BERMASALAH

SELESAI

5

21 APRIL 2014

LANTAI 1 DEKANAT

MCCB TERBAKAR

SELESAI (GANTI BARU)

6

13 MEI 2014

PD 3

AC DI RUANGAN PD 3 TIDAK DINGIN (DIMAKAN TIKUS)

SELESAI

7

361/UN10.6.3/AK/2014

14 MEI 2014

KAJUR TEKNIK PENGAIRAN

MEMPERBAIKI SUARA POMPA AIR DI SEKITAR KAMAR MANDI RUANG KULIAH

SELESAI

8

688/UN/10.64/TU/2014

19 MEI 2014

KAJUR TEKNIK ELEKTRO

PENGGANTIAN LAMPU DI GEDUNG A DAN GEDUNG B (LAMPU TL 40 WATT 16 BUAH, LAMPU TL 20 WATT 10 BUAH, STATER 20 9BUAH, TRAFO 40 WATT 1 BUAH, TRAFO 20 WATT 1 BUAH)

SELESAI (26 MEI 2014)

9

20 MEI 2014

TEKNIK MESIN

LAMPU MATI

SELESAI

10

20 MEI 2014

KEAMANAN

AIR MATI SEMUA DI BAWAH (LANTAI 1 )

SELESAI

11

26 MEI 2014

PSIK FT

SALURAN AC BOCOR

SELESAI

12

28 MEI 2014

LAB. MEKTAN

MATI LAMPU

SELESAI

13

384/UN10.6.3/AK/2014

TEKNIK PENGAIRAN

PEMASANGAN INSTALASI JARINGAN TELPON LOKAL 3 TITIK DI RUANG PMD, KALAB AIR DAN TANAH, KALAB PERENCANAAN BANGUNAN DAN JARINGAN LAN

SELESAI 22 JULI 2014

14

133/UN10.6.8/KU/2014

2 JUNI 2014

SEKJUR TEKNIK KIMIA

PERMOHONAN PERBAIKAN INSTALASI LISTRIK

SELESAI

15

4 JUNI 2014

TEKNIK KIMIA

LAMPU MATI R. RAPAT

SELESAI

16

6 JUNI 2014

PENGAIRAN

TELPON SEKJUR PENGAIRAN TIDAK BISA KELUAR MASUK

SELESAI

17

9 JUNI 2014

147/UN10.6.8/KU/2014

TEKNIK KIMIA

PEMBAHARUAN JARINGAN KABEL LISTRIK GEDUNG D TEKNIK KIMIA FT UB

SELESAI

18

10 JUNI 2014

807/UN10.6.4/TU/2014

TEKNIK ELEKTRO

PENGURASAN WC / SEPTICTACK DI GEDUNG B JURUSAN TEKNIK ELEKTRO

SELESAI

19

851/UN10.6.4/TU/2014

18 JUNI 2014

TEKNIK ELEKTRO

PENGAJUAN PENGGANTIAN LAMPU TL 40 WATT (16 BUAH)

SELESAI (24 JUNI 2014)

20

23 JUNI 2014

PENGAIRAN

LISTRIK DI R. KAJUR MATI

SELESAI

21

30 JUNI 2014

KEPEGAWAIAN

TLPON DI LANTAI 6 (KEPEGAWAIAN) BERMASALAH

SELESAI (30 JUNI 2014)

22

1 JULI 2014

 

JENDELA KACA PADA LORONG LANTAI 4 RUSAK / LEPAS ENGSELNYA

SELESAI (1 JULI 2014)

23

1 JULI 2014

 

LAMPU LIFT, LAMPU KAMAR MANDI LT. I DAN LT. III RUSAK

SELESAI (1 JULI 2014)

24

2 JULI 2014

 

LINE TELPON 587711 BERMASALAH (NADA ADA TIDAK BISA PANGGIL)

SELESAI (2 JULI 2014)

25

3 JULI 2014

 

POLISER LT. II BERMASALAH

SELESAI ( 3 JULI 2014)

26

3 JULI 2014

 

ALARM HIDRANT BERMASALAH

SELESAI (3 JULI 2014)

27

4 JULI 2014

TEKNIK KIMIA

LISTRIK GEDUNG D TEKNIK KIMIA MATI

SELESAI

28

7 JULI 2014

 

LAMPU HE DI LANTAI 6 (TOILET) MATI, LANTAI 5 (LOBI) MATI, LANTAI 4 (LOBI) MATI

SELESAI

29

7 JULI 2014

TEKNIK INDUSTRI

SALURAN PIPA AIR DI JURUSAN TEKNIK INDUSTRI PUTUS (TERJADI KEBOCORAN)

PROSES

30

7 JULI 2014

 

LIFT A GEDUNG DEKANAT MACET / TIDAK BERJALAN

SELESAI

31

11 JULI 2014

TEKNIK ELEKTRO

LISTRIK MATI

SELESAI (11 JULI 2014)

32

11 JULI 2014

DEKANAT

LIFT GEDUNG DEKANAT MATI

SELESAI (11 JULI 2014)

33

14 JULI 2014

LANTAI 6 DEKANAT

LAMPU PCL 26 W MATI

SELESAI (14 JULI 2014)

34

14 JULI 2014

TANGGA LANTAI 3,4 DEKANAT

LAMPU SL 23 W MATI

SELESAI (14 JULI 2014)

35

14 JULI 2014

DEKANAT

POMPA AIR MACET

SELESAI (14 JULI 2014)

36

14 JULI 2014

POS SATPAM

LAMPU SL 8 W DAN FITTING MATI/RUSAK

SELESAI (14 JULI 2014)

37

384/UN10.6.3/AK/2014

15 JULI 2014

TEKNIK PENGAIRAN (LAB. RANCANG BANGUN, RUANG AIR TANAH, RUANG PMD 1415)

PEMASANGAN INSTALASI JARINGAN TELPON LOKAL 3 TITIK DI RUANG PMD, KALAB AIR DAN TANAH, KALAB PERENCANAAN BANGUNAN DAN JARINGAN LAN

SELESAI 15 JULI 2014

38

21 Juli 2014

RUANG KASUBAG KEUANGAN DAN KEPEGAWAIAN

TELPON DI RUANG KASUBAG KEUANGAN DAN KEPEGAWAIAN MATI

SELESAI 21 JULI 2014

39

21 Juli 2014

TEKNIK SIPIL

LAMPU SL 23 W MATI

SELESAI 21 JULI 2014

40

21 Juli 2014

DEKANAT

LAMPU SL 23 W DI LANTAI 3,4,5 MATI

SELESAI 21 JULI 2014

41

23 Juli 2014

DEKANAT

JARINGAN MIC DI LANTAI 2 RUSAK

SELESAI 23 JULI 2014

42

23 Juli 2014

POS SATPAM

TALI BACKDROP DEPAN POS SATPAM PUTUS

SELESAI 23 JULI 2014

43

24 Juli 2014

TEKNIK ELEKTRO

PESAWAT TELPON DI RUANG BACA TEKNIK ELEKTRO SUARA TIDAK JELAS

SELESAI 24 JULI 2014

44

24 Juli 2014

TEKNIK ELEKTRO

KRAN AIR DI DEKAT PERPUSTAKAAN TEKNIK ELEKTRO PATAH

SELESAI 24 JULI 2014

45

24 Juli 2014

TEKNIK SIPIL

LAMPU TL 40 W, TL 20 W DAN TRAFO DI RUANG KULIAH TEKNIK SIPIL RUSAK

SELESAI 24 JULI 2014

46

5 Agustus 2014

TEKNIK PENGAIRAN

SALURAN TELPON PUTUS DI RECORDING PENGAIRAN

SELESAI, 5 AGUSTUS 2014

47

11 Agustus 2014

DEKANAT

LAMPU MATI DI AREA DEKANAT

         PLC 26 W di LANTAI 2 (8 Buah)

         SL/HE 18 W di LANTAI 1 (1 Buah)

         SL/HE 23 Wdi LANTAI 4 (1 Buah)

         PLC 26 W di LANTAI 4 (2 Buah)

SELESAI, 11 AGUSTUS 2014

48

13 Agustus 2014

1120/UN10.6.4/TU/2014

TEKNIK ELEKTRO

         LAMPU MERKURI + PITING (1 BUAH)

         LAMPU SL (2 BUAH)

SELESAI, 19 AGUSTUS 2014

49

13 Agustus 2014

PWK

LAMPU DI LANTAI 3 PWK MATI

SELESAI, 15 AGUSTUS 2014

50

13 Agustus 2014

PWK

TANDON AIR HABIS

SELESAI

51

18 Agustus 2014

1162/UN10.6.4/TU/2014

TEKNIK ELEKTRO

PENGGANTIAN LAMPU SL 20 WATT (5 BUAH) DI GEDUNG C TEKNIK ELEKTRO

SELESAI, 20 AGUSTUS 2014

52

18 Agustus 2014

DEKANAT

KRAN DI GEDUNG DEKANAT DEPAN GENSET RUSAK (PATAH)

SELESAI, 18 AGUSTUS 2014

53

18 Agustus 2014

DEKANAT

TANDON AIR GEDUNG DEKANAT LANTAI 8 KADANG TIDAK NORMAL (POMPA AIR SERING MACET)

SELESAI, 18 AGUSTUS 2014

54

18 Agustus 2014

TEKNIK PENGAIRAN

LISTRIK DI LAB. JALAN RAYA MARI/ARUS LISTRIK TIDAK STABIL

SELESAI, 18 AGUSTUS 2014

55

18 Agustus 2014

TEKNIK ELEKTRO

LAMPU MERCURY DI GEDUNG ELEKTRO (A) SEBELAH BARAT MATI

SELESAI, 18 AGUSTUS 2014

56

18 Agustus 2014

TEKNIK ELEKTRO

LAMPU DOF DI SEBELAH TIMUR GEDUNG A MATI

SELESAI, 18 AGUSTUS 2014

57

18 Agustus 2014

TEKNIK ELEKTRO

SALURAN/ JARINGAN TELPON TIDAK STABIL DI RUANG BACA JURUSAN TEKNIK ELEKTRO

SELESAI, 20 AGUSTUS 2014

58

27 Agustus 2014

TEKNIK PENGAIRAN

AIR DI JURUSAN PENGAIRAN (RUANG KULIAH LANTAI DASAR) MATI

SELESAI, 27 AGUSTUS 2014

59

1 September 2014

TEKNIK KIMIA

AC MATI DI R. TK 5 LANTAI 2 TEKNIK KIMIA

SELESAI, 4 SEPTEMBER 2014

60

2 September 2014

DEKANAT

SERVICE BESAR GENSET

SELESAI, 3 SEPTEMBER 2014

61

4 September 2014

DEKANAT

LAMPU PLC 26 W SEBANYAK 8 BUAH DI LANTAI 1 MATI

SELESAI, 4 SEPTEMBER 2014

62

8 September 2014

TEKNIK KIMIA

LAMPU DI 3 RUANG TEKNIK KIMIA MATI

SELESAI, 8 SEPTEMBER 2014

63

8 September 2014

TEKNIK PENGAIRAN

LCD DI RUANG CAPITA SELECTA TROUBLE

SELESAI, 8 SEPTEMBER 2014

64

8 September 2014

1292/UN10.6.4/PS/2014

KAJUR TEKNIK ELEKTRO

PERBAIKAN ATAS KERUSAKAN POMPA AIR GEDUNG B JURUSAN TEKNIK ELEKTRO FT UB

SELESAI

65

8 September 2014

TEKNIK MESIN

LISTRIK MATI

SELESAI, 8 SEPTEMBER 2014

66

11 September 2014

TEKNIK INDUSTRI

SALURAN LISTRIK TEKNIK INDUSTRI BERMASALAH

SELESAI, 11 SEPTEMBER 2014

67

11 September 2014

TEKNIK KIMIA

SALURAN LISTRIK DAN AC TEKNIK KIMIA BERMASALAH

SELESAI, 11 SEPTEMBER 2014

68

15 September 2014

DEKANAT

LAMPU TL 20 W DI LANTAI 3 (TOILET) MATI

SELESAI, 15 SEPTEMBER 2014

69

15 September 2014

DEKANAT

LAMPU HE 23 W DI LANTAI 4 (TOILET) MATI

SELESAI, 15 SEPTEMBER 2014

70

15 September 2014

DEKANAT

LAMPU HE 23 W DI LANTAI 3 (LOBI) MATI

SELESAI, 15 SEPTEMBER 2014

71

15 September 2014

DEKANAT

WASTAFEL DI LANTAI 3 DAN 5 ADA YANG BOCOR

SELESAI, 15 SEPTEMBER 2014

72

17 September 2014

DEKANAT

WASTAFEL DI TOILET WANITA LANTAI 1 BOCOR

SELESAI, 17 SEPTEMBER 2014

73

22 September 2014

DEKANAT

DAUN PINTU KAMAR MANDI PRIA LANTAI 4 MACET

SELESAI, 22 SEPTEMBER 2014

74

23 September 2014

DEKANAT

AC MATI DI LANTAI 5 GEDUNG DEKANAT (BATERAI HABIS)

SELESAI, 23 SEPTEMBER 2014

75

23 September 2014

GEDUNG PKH

STOP KONTAK DI GEDUNG PKH RUSAK

SELESAI, 23 SEPTEMBER 2014

76

23 September 2014

TEKNIK SIPIL

STOP KONTAK DI RECORDING TEKNIK SIPIL RUSAK

SELESAI, 23 SEPTEMBER 2014

77

24 September 2014

DEKANAT

BATERAI LIFT GEDUNG DEKANAT HABIS

SELESAI, 24 SEPTEMBER 2014

78

24 September 2014

TEKNIK KIMIA

KRAN BOCOR DI TEKNIK KIMIA

SELESAI, 24 SEPTEMBER 2014

79

25 September 2014

DEKANAT

MESIN POMPA HYDRANT DAN POMPA BERMASALAH

SELESAI, 25 SEPTEMBER 2014

80

25 September 2014

DEKANAT

SLOT PINTU LANTAI 3 KAMAR MANDI PRIA RUSAK

SELESAI, 25 SEPTEMBER 2014

81

25 September 2014

TEKNIK KIMIA

AC DI JURUSAN TEKNIK KIMIA BERMASALAH

SELESAI, 25 SEPTEMBER 2014

82

26 September 2014

TEKNIK INDUSTRI

LIFT DI JURUSAN TEKNIK INDUSTRI KORSLET

SELESAI, 26 SEPTEMBER 2014

83

26 September 2014

DEKANAT

PINTU KACA LANTAII 1 GEDUNG DEKANAT RUSAK

SELESAI, 26 SEPTEMBER 2014

84

26 September 2014

DEKANAT

SALURAN WASTAFEL LANTAI 5 GEDUNG DEKANAT BERMASALAH

SELESAI, 26 SEPTEMBER 2014

85

27 September 2014

DEKANAT

LAMPU PADA LOBI GEDUNG DEKANAT MATI (12 BUAH)

SELESAI, 27 SEPTEMBER 2014

86

27 September 2014

DEKANAT

TEKANAN AIR TANDON ATAS GEDUNG DEKANAT LANTAI 8 KURANG LANCAR

SELESAI, 27 SEPTEMBER 2014

87

27 September 2014

DEKANAT

SALURAN MIC LANTAI 2 GEDUNG DEKANAT BERMASALAH

SELESAI, 27 SEPTEMBER 2014

88

29 September 2014

PWK

INSTALASI PADA JURUSAN PWK (RUANG DOSEN) MATI

SELESAI, 29 SEPTEMBER 2014

89

30 September 2014

DEKANAT

PEMASANGAN STOP KONTAK DI RUANG 5.4 LANTAI 5

SELESAI, 30 SEPTEMBER 2014

90

30 September 2014

TEKNIK PENGAIRAN

RUANG SEKJUR DAN RECORDING DI JURUSAN TEKNIK PENGAIRAN SEBAGIAN LAMPU DAN AC MATI

SELESAI, 30 SEPTEMBER 2014

91

1 Oktober 2014

DEKANAT

AC DI LANTAKI 6 SEBAGIAN MATI

SELESAI, 1 OKTOBER 2014

92

1 Oktober 2014

TEKNIK SIPIL

LISTRIK TIDAK STABIL AKIBAT AC DAN LCD SERING GANGGUAN DI RUANG KULIAH D1 DAN D2

SELESAI, 1 OKTOBER 2014

93

1 Oktober 2014

TEKNIK INDUSTRI

JURUSAN TEKNIK INDUSTRI LISTRIK MATI / FOSE

SELESAI, 3 OKTOBER 2014

94

2 Oktober 2014

285/UN10.6.8/PS/14

KETUA MINAT TEKNIK KIMIA

PERMOHONAN PEMASANGAN 2 LINE TELPON DI MINAT TEKNIK KIMIA

PROSES

95

3 Oktober 2014

DEKANAT

SALURAN WASTAFEL LANTAI 6 (TOILET WANITA) MACET

SELESAI, 3 OKTOBER 2014

96

7 Oktober 2014

DEKANAT

PERBAIKAN SLOT PINTU DI LANTAI 3 (PINTU KAMAR MANDI PRIA DAN TEMPAT WUDHU) GEDUNG DEKANAT

SELESAI, 8. OKTOBER 2014

97

7 Oktober 2014

DEKANAT

JARINGAN LISTRIK LANTAI 3 MUSHOLA MATI

SELESAI, 7 OKTOBER 2014

98

15 Oktober 2014

DEKANAT

GANGGUAN PADA NEPEL AKI (RUNNING GENSET)

SELESAI, 15 OKTOBER 2014

99

16 Oktober 2014

SIPIL

PIPA SALURAN AIR DI LAB. TRANSPORTASI BAGIAN LUAR ADA YANG BOCOR

SELESAI, 16 OKTOBER 2014

100

16 Oktober 2014

DEKANAT

MEMPERBAIKI LINE MIC PODIUM LANTAI II DEKANAT

SELESAI, 16 OKTOBER 2014

101

16 Oktober 2014

TEKNIK INDUSTRI

MEMPERBAIKI LISTRIK RECORDING DAN RUANG KAJUR TEKNIK INDUSTRI

SELESAI, 16 OKTOBER 2014

102

16 Oktober 2014

SIPIL

MEMPERBAIKI SALURAN AIR YANG BOCOR DI JURUSAN TEKNIK SIPIL

SELESAI, 16 OKTOBER 2014

103

16 Oktober 2014

DEKANAT

LAMPU LCD PROYEKTOR DI LANTAI II MATI

PROSES

104

16 Oktober 2014

TEKNIK KIMIA

AIR DI JURUSAN TEKNIK KIMIA DEKAT TEKNIK INDUSTRI MATI TOTAL

SELESAI, 16 OKTOBER 2014

105

17 Oktober 2014

960/UN10.6.66/AK/2014

KAJUR PWK

AC DI RUANG KAJUR-SEKJUR TIDAK DINGIN

BELUM

106

20 Oktober 2014

TEKNIK INDUSTRI

AIR PAM DI JURUSAN TEKNIK INDUSTRI MATI

SELESAI, 20 OKTOBER 2014

107

24 Oktober 2014

423/UN10.6.1/PS/2014

KAJUR T. SIPIL

ALIRAN LISTRIK DI JURUSAN SIPIL SERING MENGALAMI LONJAKAN MAUPUN PENURUNAN

PROSES

108

27 Oktober 2014

DEKANAT

SERVICE LIFT GEDUNG DEKANAT

SELESAI, 27 OKTOBER 2014

109

27 Oktober 2014

LIFT DEKANAT

LAMPU TL 20 W DI LIFT 1 DAN 2 MATI

SELESAI, 27 OKTOBER 2014

110

27 Oktober 2014

DEKANAT

TERJADI ARUS PENDEK PADA SALURAN LISTRIK DI LANTAI 1 GEDUNG DEKANAT

SELESAI, 27 OKTOBER 2014

111

28 Oktober 2014

DEKANAT

KRAN DI DEPAN GENSET DEKANAT BOCOR

SELESAI, 28 OKTOBER 2014

UPDATE 28 OKTOBER 2014